Project Description

University of Nevada, Reno

General Contractor: Q&D Construction
Square Feet: 275,000
Design/Build or Plan & Spec: Plan & Spec

The University Gateway Project at the University of Nevada, Reno consisted of mechanical (dryside) 33,000 fabrication and installation hours with a “No Lost Time Injury” record, an extensive commissioning process and Complex System coordination with “on site” CAD team.

  • 10 air handlers, two per floor; with a VAV re-heat duct distribution system.
  • Additional rooftop air handler units provide comfort and humidity in book storage and racking areas
  • Atrium smoke evacuation, stair pressurization and make-up air system installed comply with high-rise life safety requirements